Refurbishment of P3 and P4 at MECC Maastricht
In August 2017, the City of Maastricht commissioned us to refurbish P3 and P4, the car parks located near the main entrance of the MECC. This project consisted of the full replacement of the superstructure, requiring approximately 3,000 m2 of asphalt and 7,000 m2 of paving. We also replaced the lighting system, as well as all parking systems, ranging from barriers to cables and ducts.
Every year, Maastricht hosts the world’s largest air fair in March, of which it is incredibly proud. As such, we faced significant political pressure to make the required delivery date. The new design features a beautiful boulevard, which guides visitors to the main entrance of the MECC.
At the time, this was the first project tackled by our ‘new’ team in the Schinnen office. Despite the bad weather and the fact that the many design changes during the project, the project was a great success, to the client’s satisfaction.